Expansion and reconstruction of a historic tenement house on Wyspa Słodowa
The implementation project of Concordia Design on Wyspa Słodowa in Wrocław includes the reconstruction and extension of the complex of the historic tenement house together with the outbuilding. The renovation of the existing tenement house has retained the facade of the building together with the characteristic decorations and cornices that have become a new, modern part of the building. The antique front door opening an extremely functional Business Park supporting the development of entrepreneurship has been preserved and restored. HUB Concordia Design is a public space as well as a co-working zone and independent offices. The three-storey building also conceals the interior of the cooking zone and chillout. A terrace with a panoramic view of the city and the largest green wall in Poland was created on the roof of the tenement house.
Comprehensive implementation of the Wielkopolska Design Center in the “design and build” formula
The investment carried out in the “design and build” mode includes the design and construction of an office and service facility with an underground garage along with the creation of a comprehensive infrastructure for the incubation of enterprises for the development of the Wielkopolska Design Center. The building is a compact, homogeneous block, laid out on three above-ground floors and one underground floor. The full usable area consists of: Living Lab platform – a modern space for design activities, testing, validation and simulation of new products and services, and an Incubation zone created for young and dynamically developing companies.
COMPREHENSIVE DEVELOPMENT OF THE HOSPITAL IN PUSZCZYKOWO
The investment plan included the expansion of the Hospital in Puszczykowo. Prof. S.T. Dąbrowskiego S.A. o the building of the Operating Block with the construction of the elevator shaft and the construction of the Operating Block with the equipment and the Central Sterilization Room in the second stage. The investment is the most modern of its kind in Wielkopolska. The new block houses 5 operating rooms, a patient preparation room for the procedure, an intensive care room and a recovery room. The building is equipped with high-class medical equipment. The central sterilization room has been equipped with, among others, in steam autoclaves and a low-temperature plasma sterilizer. The challenge in the course of the works was the performance of construction works during the continuous operation of the Hospital.
IMPLEMENTATION OF A NEW PRIMARY SCHOOL BUILDING
The new wing of the school was built on the site of the old building, which had been demolished earlier. Modern classrooms as well as corridors have been made in accordance with the latest solutions for educational establishments. The building was built with the youngest users in mind and fully adapted to the needs of people with disabilities. The implementation also gained a fully equipped courtyard, which included elements of small architecture such as designer benches and lighting, but also a playground that stimulates the imagination.
COMPREHENSIVE IMPLEMENTATION OF THE DEMONSTRATION CENTER IN THE INDUSTRIAL AND TECHNOLOGICAL PARK
The implementation is a modern facility with demonstration centers, workshops and “live laboratories”. The center consists of two parts – the office, which occupies a total of approximately 2,000 m2, and the hall one with a total area of approximately 4,000 m2. The facility will also include two large Open Space rooms. The hall part has been divided into larger and smaller halls with areas from 900 m2 through 360, 90 to the smallest, respectively, only 60m2. Laboratory rooms and workshops are provided as places to create, implement and test projects. Land development around the investment was also designed and implemented comprehensively.
GENERAL CONTRACTING OF A NEW HEADQUARTER OF THE TECHNICAL SCHOOL
The facility will provide the school with an area of over three thousand square meters. The building has been equipped so that it fulfills both didactic and practical functions. Passenger lifts with access control were installed, allowing efficient, controlled movement around the building. The investment has been equipped with solar panels. The building includes, among others, fully equipped: car workshop, mechanical workshop, mechatronics workshop, PLC workshop, electronics workshop – electromechanics, CAD / CAM workshop, hotel workshop, animal production workshop, plant production workshop, two computer labs and assembly hall, dividing by means of movable walls into 4 regular classrooms.
CONSTRUCTION OF A NEW POVIAT HOSPITAL
The investment carried out in the “design and build” formula included the design and construction of a new wing and reconstruction of some of the existing facilities, as well as comprehensive equipment. The investment houses a admission room, an endoscopic laboratory, and internal, children’s and gynecological wards. The new wing is a modern, three-storey building fully adapted to the needs of the disabled.
GENERAL CONTRACTING OF A TRAINING AND EXAMINATION FACILITY WITH A MANEUVERAGE SQUARE
A two-story office building with a cubature of over 10,000m3, together with an above-ground car park. The facility has been divided into zones: generally accessible, zone for candidates and trainees, an administrative and social zone for employees. The implementation was equipped with access control and adapted to the needs of people with disabilities. Examination and maneuvering area for candidates for driving licenses in the categories A, AM, A1, A2, B, B1, B + E, C, C1, C1 + E, C + E, D, D1, D1 + E , D + E, T. Stands for performing main maneuvers for category B vehicles and a stand for starting on a hill (so-called hill).
COMPREHENSIVE IMPLEMENTATION OF THE HOSPICE FACILITY IN THE “DESIGN AND BUILD” SYSTEM
The investment carried out in the “design and build” system included the development of design documentation and construction works for the Kujawsko-Pomorskie Medical Investments and the District Chamber of Nurses and Midwives in Toruń. The two-story building with a partial basement houses, among others 16 single and double patient rooms, a palliative care clinic, a rehabilitation room, a psychologist’s reception room, a chapel and a winter garden. The usable area of the building is 1.5 thousand square meters. The hospice was established in the area under the supervision of the conservator, where the high groundwater table was a significant challenge for the construction works.
EXPANSION OF THE UNIVERSITY HOSPITAL CARDIOLOGY CLINIC
The expansion of the cardiology clinic’s facility included the modernization and reorganization of the rooms of the operating block located on the first floor in diagnostic and surgical building A, as well as the rooms of the operating block located on the ground floor of diagnostic and surgical building C and the eastern connector. The works covered a comprehensive modernization of the building along with the arrangement of the rooms. The investment has been equipped with specialized equipment such as equipment for treatment rooms, bedside panels and medical furniture.
IMPLEMENTATION OF REHABILITATION BRANCHES IN THE “DESIGN AND BUILD” FORMULA
As part of the reconstruction and expansion project, demolition of one of the hospital buildings was planned to create a new hemodynamic laboratory and infrastructure development for the rehabilitation center. The modern building has been designed: Department of Physiotherapy, Department of Cardiac Rehabilitation and Department of Neurological Rehabilitation. The building has three floors above ground and one underground. The scope of the project also included the modernization of access roads, pavements and other works related to the development of the area adjacent to the modernized building.
EXTENSION OF PRIMARY SCHOOL
The implementation included the extension of the existing facility with a new, two-story wing. The investment required the reconstruction of the existing part of the building as well as adaptation and reorganization of the existing elements of communication routes. In the extended part of the school, classrooms for preschoolers, well-equipped classrooms for students, teacher’s offices and a fully functional kitchen serving the facility found their place. Modernized communication spaces are recreational areas for children.
GENERAL CONTRACTING OF ENTERTAINMENT SPORTS HALL
The investment consists in the comprehensive construction of a sports and entertainment hall, consisting of a sports hall with an internal field of 24x44m with a division into fields, including for volleyball, basketball, tennis, handball, with curtains enabling the division of the hall into parts, as well as a grandstand for spectators. The implementation also involved the implementation of a small room for fitness and aerobics classes. There were also rooms for teachers, cloakrooms with sanitary facilities, and other rooms necessary for the functioning of the sports and entertainment hall, including the needs of the disabled. The area around the hall was also developed, including internal roads, pavements, as well as parking spaces and greenery development.
COMPREHENSIVE IMPLEMENTATION OF MUNICIPAL FLAT BLOCKS
As part of the investment at ul. Cymsa in Gniezno WEGNER Company formed two blocks. Senior block equipped with a trolley, a drying room and a common room, as well as a communal and social block – with a boiler room, commercial and service premises, drying room and room for bicycles. Both buildings have underground garage floors. The senior building houses 26 apartments, 46 communal and social facilities. A playground has also been built, lined with polyurethane to increase safety. The recreational part is completed by fitness equipment and a covered gazebo – intended for community use.
REALIZATION OF A SPORTS HALL SPOT
The hall completed for the Gniezno Sports and Recreation Center is an object that fulfills both sports – training and tournament functions, as well as a full-fledged performance hall. The building area is over 5,000.00 m2, and the cubage is about 40,000.00 m3. On the main stage of the hall there is a grandstand for 1200 seats and a place for 300 additional fold-out seats. The facility has pitches allowing rivalry among others in volleyball, basketball, handball, futsal, badminton. The main arena was constructed in such a way as to simultaneously fulfill the function of a spectacular hall. The stage space has been equipped with professional sound system and effect lighting.
GENERAL CONTRACTOR OF THE HOSPITAL IN WAŁCZ
This investment, carried out in 15 months for the 107th Military Hospital in Wałcz, included the comprehensive implementation of a new operating block building with a central sterilizer, which is an autonomous part of an existing hospital, preceded by the preparation of project documentation. The investment was carried out using the latest technologically advanced solutions. The building will include a department of anaesthesiology and intensive medical therapy together with accompanying rooms, four operating rooms including one modern hybrid room and a central sterilization facility.
OFFICE-COMMERCIAL BUILDING WITH PARKING AND THE INTERNAL ROAD
The facility has been extended and comprehensively implemented as a boutique office building with a tasteful style. A five-storey building located in the center of Poznań, in a convenient communication point. It fits into the service-residential surroundings. The office building has been completed with the employees in mind for the comfort. The use of modern technologies for the Smoker Office will be a comfortable workplace. On the ground floor there is a service zone, higher floors for office space. It is adapted to the needs of disabled people.
THE EXPANSION OF THE COUNTY HOSPITAL
The construction in Środa Wielkopolska involved the expansion of the district hospital with the implementation of all installations, including the installation of medical gases, as well as the furnishing of the facility with medical panels and incandescent operating lamps. In addition, a three-storey wing was added with a link to the main building and rebuilt existing rooms. The total usable area of the hospital is 3141,40m2
PATOMORPHOLOGY BUILDING
The completed building is a new facility with three overground storeys. The building was constructed on the basis of existing cellars. The investment will house the Patomorfology Department of the hospital. The project includes, among others, material reception room, laboratory, secretariat, dissecting room, farewell room, conference room, toilets – including for the disabled – social and economic rooms for staff and the addition of a hospital garage. From the east, the newly built building borders on an existing warehouse. The building uses, among others access restriction systems for personnel only.
„DESIGN AND BUILD” FOR ROMA INVESTMENTS
In May 2017 another hall in the “design and build” system was completed. The project covered the creation of a single storey warehouse with an area of over 7400 m2 with a three-storey office building with an area of over 1200m2.
DESIGN AND BUILD” IN GRODZISK WIELKOPOLSKI
In Grodzisk Wielkopolski the building of the Independent Public Health Care Unit was built (construction of a new wing of the Hospital with the Outpatient Unit, Internistic Cardiology Department, Gynecology Ward, Obstetrics and Neonatology Department, Delivery Team and technical rooms, and expansion of the Department of Anaesthesiology and Intensive Care) rooms of the Operational Block and Department of Anaesthesiology and Intensive Care.
OF A MODERN PRODUCTION FACTORY OF A MODERN PRODUCTION FACTORY
In 2017, the design and production company IDEAPRO Sp. Z o.o. In the area of the southern economic zone of Nowa Sól a modern three-aisled production and storage hall with a support structure of steel girders and an office building with traditional masonry, mullion and transom construction has been erected.
THE GENERAL CONTRACTOR OF A BUSSINES & SPORTS HALL WITH THE PITCH
The sports and recreation hall is a 2-storey building with an area of about 1200m2. The building was constructed in an industrial style – raw walls, concrete blocks ceilings from compressed beams and pressed wood fillings, visible cable routes, roof construction – glued wood. Elevation – clinker combined with façade sheet and aluminum facade – in line with school build next to it.
„DESIGN AND BUILD” OF A WAREHOUSE FOR LEVANT
Commitioned by Levant company, in Komorniki, a warehouse building along with an office spaces was built. The total usable area is 6678,76m2. The construction consisted of the design together with the complete proces of the construction works.
GENERAL CONTRACTOR OF A COMMERCIAL BUILDING
A commercial, service and office building in Witkowo is a three-storey building. On the first floor there is a retail and service area, public communication and public toilets for customers and staff, and a technical room. The last two floors (1st floor and 2nd floor) are for office use. A building in a corridor layout with office rooms and necessary hygienic and sanitary and commercial rooms. Access via a staircase from the ground level, regardless of the commercial and service level.
GENERAL CONTRACTOR FOR „POSTĘP” – MANUFACTURING COMPANY
The works were aimed at building a new part of the production building with a total area of over 12,000 m2 – including a production hall, switchgear, concierge, warehouse, fire hydrant, decks, car parks, squares and maneuvers. The reconstruction of the technical building and the boiler room, the demolition of parts of existing production buildings and the execution of new technical and technological infrastructure were also performed. The new building has been put into operation as scheduled.
BUILDING OF SCHOOL COMPLEX IN KAMIONKI
The construction that started in June 2016 is a two-storey building for junior high school and one-storey for kindergarten and nursery. In addition, a one-storey sports hall was built, for the audience of less than 200 people. Thanks to the modern method of modular connection of rooms, the room can easily be divided into two smaller ones which gives the possibility of conducting two simultaneous events. Buildings with a total usable area of 5606.26 m2 were completed on 1 September 2017.
GENERAL CONTRACTING OF KINDERGARTEN
Kindergarten in Mała Nieszawka is a six-branch facility for 150 children. In less than four months, a 2-storey building with a rectangular block was built. On the ground floor there are classrooms with necessary sanitary facilities, locker rooms, a carriage and warehouses, on the first floor there are class rooms with sanitary facilities and administrative rooms. The entire building is adapted to the needs of disabled people.
EXTENSION OF A PRIMARY SCHOOL IN DĘBNICA
The newly constructed building is primarily a modern sports hall, but also 4 specialized, well-equipped educational laboratories – computer, language, mathematics and nature. In the building, a therapeutic room was additionally located. As part of the investment, thermo-modernization and renovation works of the existing school building were also carried out. The school’s transport system was also changed, planned from the north.
CONSTRUCTION OF THE SPORTS HALL IN ZANIEMYŚL
The building next to the school consists of the main hall (hall), which serves as a gym and a two-storey auxiliary part connected to the existing school building. The ground floor consists of social rooms such as locker rooms, shower rooms, warehouses, teacher and trainer rooms and a gym. On the first floor there is a fitness room, gym for correctional gym, wellness room, sauna, lecture hall and sanitary facilities. The sports plate itself has dimensions of 44 m x 22.5 m and stands more than 200 seats.
BIOFUEL PRODUCTION HALL -„DESIGN AND BUILD” IN ŁOWYŃ
In Łowyń, a full-scale design project was implemented along with a comprehensive proces of the production hall – for the production of ecological fuels from straw together all together with the social and office part. The area covered was 2.92 ha, undeveloped and unarmed. The project has a usable area of 2201.60 m2 and a volume of 22483.91 m3, creating a coherent whole from both technological to the aesthetic point of view
A3 WSSD EXPANSION, EXTENSION AND RECONSTRUCTION
The investment plan included the expansion of the A3 body of the Provincial Specialist Children’s Hospital in Olsztyn with an area of almost 700 m2, and the renovation of the existing part with the extension of the floor with a connector. In the first stage, two floors were commissioned. The 1st floor houses the Department of Anaesthesiology and Intensive Therapy, equipped with medical columns with an administrative section. On the second floor there is the Infectious Disease Ward with Meltzer chambers equipped with a filtering system, which enable the treatment of patients infected with extremely dangerous viruses. In the second stage, the technical part of the hospital on the ground floor and the Pediatric Wards on the 3rd and 4th floor of the building were built.
CONSTRUCTION OF THE SPROT HALL FOR PIOTR-SKARGA SCHOOL IN SZAMOTUŁY
The completed facility is a multifunctional facility that has been integrated into an existing school with a connector housing changing rooms, toilets, a room for trainers and a warehouse for sports equipment. The building was also equipped by PKOB Wegner – it has gating curtains that allow to divide the halls into 3 independent pitches and portable stands, from which the audience can watch the sports struggles. It is fully adapted to the needs of people with disabilities.
CONSTRUCTION OF SHOPPING CENTER
The investment in Sulechów is a one-story commercial building, which is an extension of the existing shopping pavilion. The building was divided into 5 commercial premises, each with its own facilities and a supply zone. The building was put into use on April 13, 2017.
GENERAL CONTRACTOR OF THE SCHOOL IN BUK
In cooperation with the City Council and the Beech Municipality the construction of Vocational Schools was completed. Apart from the building itself, the investment included installation equipment, technical infrastructure and the development of the school grounds. Usable area of this two-storey building is 1214,25 m2.
GENERAL CONTRACTOR OF THE PRIMARY SCHOOL IN MIŁOSŁAW
In less than a year, another building was completed, this time at the request of the Municipality of Miłosław. At the Primary School in Miłosław the construction works included: construction, sanitary, electrical, mechanical ventilation, gas boiler and land development.
Extension and reconstruction of the hospital facility to create a Trauma Center
The investment included the construction of a 2-storey building, which is the reconstruction and extension of the A3 body of the Provincial Specialist Children’s Hospital in Olsztyn. The building was created to create a Diagnostic and Treatment Team (ZDZ) necessary for the creation of a Trauma Center for Children. The first storey of the building has been adapted for technical purposes, while the second storey houses the treatment and administration part. Treatment rooms located on the second floor are equipped with specialized medical columns and laminar ceilings.
EXPANSION AND RENOVATION OF POLICE’S HEADQUARTERS IN GNIEZNO
The building of the Police District Headquarters in Gniezno has been completely modernized, including the reconstruction of the sanitary facilities, the replacement of all installations and the adjustment to the needs of the disabled as well as fire regulations. Moreover, the project included the addition of a new office wing, a technical building together with a shooting gallery and a garage building.
GENERAL CONTRACTOR OF THE SPORTS HALL WITH THE PITCH
The construction included a fully-equipped sports hall measuring 30 by 45 meters and a height of 12 meters with a fixed audience for 211 viewers and an additional one for150 persons, fully adapted for the needs of the disabled. Dimensions of the hall allow it to divide into three pitches measuring 15 by 24 meters. Usable floor area is 2746 m2. The facility will also include rooms for operating the weight lifting section – 276 m2 with 12 platforms for the competitors.
DESIGN AND CONSTRUCTION FOR JEREMIAS
The building in Gniezno is 3300 m² of usable area of steel production and warehouse hall. As requested by the investor, PKOB Wegner has been responsible for the whole proces starting with full design service with visualization, execution projects and full infrastructure and ending with the valid license for use.
GENERAL CONTRUCTOR OF THE SPORTS HALL IN GNIEZNO
The building includes a one-storey gymnasium with which the three-storey, lower part is connected. It is possible for 52 people to take part in different activities at the gym at the same time. There is also a stand for a total of 124 seats. Entrance to the stands is ensured from the staircase. The main entrance to the building has been designed in such a way as to allow access to the disabled.
REVITALIZATION OF THE FAIR IN THE CENTER OF THE CITY OF GNIEZNO
Under strict archaeological supervision at 21 od January, the Market Square in Gniezno was revitalized. The two-storey building, in which the market plate is also the roof of the car park, covers shopping areas with stalls, sanitary facilities and utility rooms. Area of reconstruction: 6268m2
CONSTRUCTION OF THE COMMERCIAL BUILDING FOR TESCO IN TRZEMESZNO
Another design for TESCO is the construction of a commercial building along with technical infrastructure in Trzemeszno. The scope of works included, among other things, the preparation of the site for construction, the installation of the necessary installations, the development of the area together with the lighting and the car park. The total usable area of the project is 1024.56 m2.
ERECTION OF BUILDING OVER OPEN SKATING RINK CHWIAŁKA IN POZNAŃ
Delivery of extensive civil works. Construction of 41 m span, delivery of deep foundation with use of 200 foundation piles. Realization of working plans and specifcations regarding foundation piles as well as working plans and specifcations and shop drawings and specifcations of steel structure of 41m span. BUILDING PARAMETERS: Building area: 2854,73 m²; Floor area: 2949,16 m²; Cubic volume: 19367 m³