- Commercial buildings
- Industrial buildings
- Office buildings
- Projects
- Public utility buildings
- Residential buildings
- Sports buildings
- Under construction
COMPREHENSIVE IMPLEMENTATION OF THE HOSPICE FACILITY IN THE “DESIGN AND BUILD” SYSTEM
Location:
The investment carried out in the "design and build" system included the development of design documentation and construction works for the Kujawsko-Pomorskie Medical Investments and the District Chamber of Nurses and Midwives in Toruń. The two-story building with a partial basement houses, among others 16 single and double patient rooms, a palliative care clinic, a rehabilitation room, a psychologist's reception room, a chapel and a winter garden. The usable area of the building is 1.5 thousand square meters. The hospice was established in the area under the supervision of the conservator, where the high groundwater table was a significant challenge for the construction works.
IMPLEMENTATION OF A NEW PRIMARY SCHOOL BUILDING
Location: PRZEŹMIEROWO, VOIVODESHIP GREATERPOLAND
The new wing of the school was built on the site of the old building, which had been demolished earlier. Modern classrooms as well as corridors have been made in accordance with the latest solutions for educational establishments. The building was built with the youngest users in mind and fully adapted to the needs of people with disabilities. The implementation also gained a fully equipped courtyard, which included elements of small architecture such as designer benches and lighting, but also a playground that stimulates the imagination.
GENERAL CONTRACTING OF A TRAINING AND EXAMINATION FACILITY WITH A MANEUVERAGE SQUARE
Location: ŁÓDŹ, VOIVODESHIP ŁÓDZKIE
A two-story office building with a cubature of over 10,000m3, together with an above-ground car park. The facility has been divided into zones: generally accessible, zone for candidates and trainees, an administrative and social zone for employees. The implementation was equipped with access control and adapted to the needs of people with disabilities.
Examination and maneuvering area for candidates for driving licenses in the categories A, AM, A1, A2, B, B1, B + E, C, C1, C1 + E, C + E, D, D1, D1 + E , D + E, T. Stands for performing main maneuvers for category B vehicles and a stand for starting on a hill (so-called hill).
GENERAL CONTRACTING OF A NEW HEADQUARTER OF THE TECHNICAL SCHOOL
Location: GRODZISK WIELKOPOLSKI, VOIVODESHIP GREATERPOLAND
The facility will provide the school with an area of over three thousand square meters. The building has been equipped so that it fulfills both didactic and practical functions. Passenger lifts with access control were installed, allowing efficient, controlled movement around the building. The investment has been equipped with solar panels. The building includes, among others, fully equipped: car workshop, mechanical workshop, mechatronics workshop, PLC workshop, electronics workshop - electromechanics, CAD / CAM workshop, hotel workshop, animal production workshop, plant production workshop, two computer labs and assembly hall, dividing by means of movable walls into 4 regular classrooms.
CONSTRUCTION OF A NEW POVIAT HOSPITAL
Location: MOGILNO, VOIVODESHIP KUYAVIAN-POMERANIAN
The investment carried out in the "design and build" formula included the design and construction of a new wing and reconstruction of some of the existing facilities, as well as comprehensive equipment. The investment houses a admission room, an endoscopic laboratory, and internal, children's and gynecological wards. The new wing is a modern, three-storey building fully adapted to the needs of the disabled.
EXPANSION OF THE UNIVERSITY HOSPITAL CARDIOLOGY CLINIC
Location: BYDGOSZCZ, VOIVODESHIP KUYAVIAN-POMERANIAN
The expansion of the cardiology clinic's facility included the modernization and reorganization of the rooms of the operating block located on the first floor in diagnostic and surgical building A, as well as the rooms of the operating block located on the ground floor of diagnostic and surgical building C and the eastern connector. The works covered a comprehensive modernization of the building along with the arrangement of the rooms. The investment has been equipped with specialized equipment such as equipment for treatment rooms, bedside panels and medical furniture.
IMPLEMENTATION OF REHABILITATION BRANCHES IN THE “DESIGN AND BUILD” FORMULA
Location: BYDGOSZCZ, VOIVODESHIP KUYAVIAN-POMERANIAN
As part of the reconstruction and expansion project, demolition of one of the hospital buildings was planned to create a new hemodynamic laboratory and infrastructure development for the rehabilitation center. The modern building has been designed: Department of Physiotherapy, Department of Cardiac Rehabilitation and Department of Neurological Rehabilitation. The building has three floors above ground and one underground. The scope of the project also included the modernization of access roads, pavements and other works related to the development of the area adjacent to the modernized building.
EXTENSION OF PRIMARY SCHOOL
Location: PATEREK, VOIVODESHIP KUYAVIAN-POMERANIAN
The implementation included the extension of the existing facility with a new, two-story wing. The investment required the reconstruction of the existing part of the building as well as adaptation and reorganization of the existing elements of communication routes. In the extended part of the school, classrooms for preschoolers, well-equipped classrooms for students, teacher's offices and a fully functional kitchen serving the facility found their place. Modernized communication spaces are recreational areas for children.
COMPREHENSIVE IMPLEMENTATION OF MUNICIPAL FLAT BLOCKS
Location: GNIEZNO, VOIVODESHIP GREATERPOLAND
As part of the investment at ul. Cymsa in Gniezno WEGNER Company formed two blocks. Senior block equipped with a trolley, a drying room and a common room, as well as a communal and social block - with a boiler room, commercial and service premises, drying room and room for bicycles. Both buildings have underground garage floors. The senior building houses 26 apartments, 46 communal and social facilities. A playground has also been built, lined with polyurethane to increase safety. The recreational part is completed by fitness equipment and a covered gazebo - intended for community use.
EXTENSION OF A PRIMARY SCHOOL IN DĘBNICA
Location: DĘBNICA, VOIVODESHIP GREATERPOLAND
The newly constructed building is primarily a modern sports hall, but also 4 specialized, well-equipped educational laboratories - computer, language, mathematics and nature. In the building, a therapeutic room was additionally located. As part of the investment, thermo-modernization and renovation works of the existing school building were also carried out. The school's transport system was also changed, planned from the north.
GENERAL CONTRACTING OF KINDERGARTEN
Location: MAŁA NIESZAWKA, VOIVODESHIP KUYAVIAN-POMERANIAN
Kindergarten in Mała Nieszawka is a six-branch facility for 150 children. In less than four months, a 2-storey building with a rectangular block was built. On the ground floor there are classrooms with necessary sanitary facilities, locker rooms, a carriage and warehouses, on the first floor there are class rooms with sanitary facilities and administrative rooms. The entire building is adapted to the needs of disabled people.
REALIZATION OF A SPORTS HALL SPOT
Location: GNIEZNO, VOIVODESHIP GREATERPOLAND
The hall completed for the Gniezno Sports and Recreation Center is an object that fulfills both sports - training and tournament functions, as well as a full-fledged performance hall. The building area is over 5,000.00 m2, and the cubage is about 40,000.00 m3. On the main stage of the hall there is a grandstand for 1200 seats and a place for 300 additional fold-out seats.
The facility has pitches allowing rivalry among others in volleyball, basketball, handball, futsal, badminton. The main arena was constructed in such a way as to simultaneously fulfill the function of a spectacular hall. The stage space has been equipped with professional sound system and effect lighting.
CONSTRUCTION OF THE SPROT HALL FOR PIOTR-SKARGA SCHOOL IN SZAMOTUŁY
Location: SZAMOTUŁY, VOIVODESHIP GREATERPOLAND
The completed facility is a multifunctional facility that has been integrated into an existing school with a connector housing changing rooms, toilets, a room for trainers and a warehouse for sports equipment. The building was also equipped by PKOB Wegner - it has gating curtains that allow to divide the halls into 3 independent pitches and portable stands, from which the audience can watch the sports struggles. It is fully adapted to the needs of people with disabilities.
PATOMORPHOLOGY BUILDING
Location: BYDGOSZCZ, VOIVODESHIP KUYAVIAN-POMERANIAN
The completed building is a new facility with three overground storeys. The building was constructed on the basis of existing cellars. The investment will house the Patomorfology Department of the hospital. The project includes, among others, material reception room, laboratory, secretariat, dissecting room, farewell room, conference room, toilets - including for the disabled - social and economic rooms for staff and the addition of a hospital garage. From the east, the newly built building borders on an existing warehouse. The building uses, among others access restriction systems for personnel only.
BUILDING OF SCHOOL COMPLEX IN KAMIONKI
Location: KAMINKI, VOIVODESHIP GREATERPOLAND
The construction that started in June 2016 is a two-storey building for junior high school and one-storey for kindergarten and nursery. In addition, a one-storey sports hall was built, for the audience of less than 200 people. Thanks to the modern method of modular connection of rooms, the room can easily be divided into two smaller ones which gives the possibility of conducting two simultaneous events. Buildings with a total usable area of 5606.26 m2 were completed on 1 September 2017.
REVITALIZATION OF THE FAIR IN THE CENTER OF THE CITY OF GNIEZNO
Location: GNIEZNO, VOIVODESHIP GREATERPOLAND
Under strict archaeological supervision at 21 od January, the Market Square in Gniezno was revitalized. The two-storey building, in which the market plate is also the roof of the car park, covers shopping areas with stalls, sanitary facilities and utility rooms. Area of reconstruction: 6268m2
GENERAL CONTRACTOR OF THE SCHOOL IN BUK
Location: BUK, VOIVODESHIP GREATERPOLAND
In cooperation with the City Council and the Beech Municipality the construction of Vocational Schools was completed. Apart from the building itself, the investment included installation equipment, technical infrastructure and the development of the school grounds. Usable area of this two-storey building is 1214,25 m2.
CONSTRUCTION OF THE SPORTS HALL IN ZANIEMYŚL
Location: ZANIEMYŚL,VOIVODESHIP GREATERPOLAND
The building next to the school consists of the main hall (hall), which serves as a gym and a two-storey auxiliary part connected to the existing school building. The ground floor consists of social rooms such as locker rooms, shower rooms, warehouses, teacher and trainer rooms and a gym. On the first floor there is a fitness room, gym for correctional gym, wellness room, sauna, lecture hall and sanitary facilities. The sports plate itself has dimensions of 44 m x 22.5 m and stands more than 200 seats.
THE GENERAL CONTRACTOR OF A BUSSINES & SPORTS HALL WITH THE PITCH
Location: GNIEZNO, VOIVODESHIP GREATERPOLAND
The sports and recreation hall is a 2-storey building with an area of about 1200m2. The building was constructed in an industrial style - raw walls, concrete blocks ceilings from compressed beams and pressed wood fillings, visible cable routes, roof construction - glued wood. Elevation - clinker combined with façade sheet and aluminum facade – in line with school build next to it.
DESIGN AND BUILD” IN GRODZISK WIELKOPOLSKI
Location: GRODZISK WIELKOPOLSKI, VOIVODESHIP GREATERPOLAND
In Grodzisk Wielkopolski the building of the Independent Public Health Care Unit was built (construction of a new wing of the Hospital with the Outpatient Unit, Internistic Cardiology Department, Gynecology Ward, Obstetrics and Neonatology Department, Delivery Team and technical rooms, and expansion of the Department of Anaesthesiology and Intensive Care) rooms of the Operational Block and Department of Anaesthesiology and Intensive Care.
ERECTION OF BUILDING OVER OPEN SKATING RINK CHWIAŁKA IN POZNAŃ
Location: POZNAŃ, VOIVODESHIP GREATERPOLAND
Delivery of extensive civil works. Construction of 41 m span, delivery of deep foundation with use of 200 foundation piles. Realization of working plans and specifcations regarding foundation piles as well as working plans and specifcations and shop drawings and specifcations of steel structure of 41m span. BUILDING PARAMETERS: Building area: 2854,73 m²; Floor area: 2949,16 m²; Cubic volume: 19367 m³
GENERAL CONTRACTOR OF THE HOSPITAL IN WAŁCZ
Location: WAŁCZ, VOIVODESHIP WEST POMERANIAN
This investment, carried out in 15 months for the 107th Military Hospital in Wałcz, included the comprehensive implementation of a new operating block building with a central sterilizer, which is an autonomous part of an existing hospital, preceded by the preparation of project documentation. The investment was carried out using the latest technologically advanced solutions. The building will include a department of anaesthesiology and intensive medical therapy together with accompanying rooms, four operating rooms including one modern hybrid room and a central sterilization facility.
THE EXPANSION OF THE COUNTY HOSPITAL
Location: ŚRODA WIELKOPOLSKA, VOIVODESHIP GREATERPOLAND
The construction in Środa Wielkopolska involved the expansion of the district hospital with the implementation of all installations, including the installation of medical gases, as well as the furnishing of the facility with medical panels and incandescent operating lamps. In addition, a three-storey wing was added with a link to the main building and rebuilt existing rooms. The total usable area of the hospital is 3141,40m2
GENERAL CONTRACTOR OF THE PRIMARY SCHOOL IN MIŁOSŁAW
Location: MIŁOSŁAW, VOIVODESHIP GREATERPOLAND
In less than a year, another building was completed, this time at the request of the Municipality of Miłosław. At the Primary School in Miłosław the construction works included: construction, sanitary, electrical, mechanical ventilation, gas boiler and land development.
EXPANSION AND RENOVATION OF POLICE’S HEADQUARTERS IN GNIEZNO
Location: GNIEZNO, VOIVODESHIP GREATERPOLAND
The building of the Police District Headquarters in Gniezno has been completely modernized, including the reconstruction of the sanitary facilities, the replacement of all installations and the adjustment to the needs of the disabled as well as fire regulations. Moreover, the project included the addition of a new office wing, a technical building together with a shooting gallery and a garage building.
A3 WSSD EXPANSION, EXTENSION AND RECONSTRUCTION
Location: OLSZTYN, WOJ. WARMIŃSKO-MAZURSKIE
The investment plan included the expansion of the A3 body of the Provincial Specialist Children's Hospital in Olsztyn with an area of almost 700 m2, and the renovation of the existing part with the extension of the floor with a connector. In the first stage, two floors were commissioned. The 1st floor houses the Department of Anaesthesiology and Intensive Therapy, equipped with medical columns with an administrative section. On the second floor there is the Infectious Disease Ward with Meltzer chambers equipped with a filtering system, which enable the treatment of patients infected with extremely dangerous viruses. In the second stage, the technical part of the hospital on the ground floor and the Pediatric Wards on the 3rd and 4th floor of the building were built.
Extension and reconstruction of the hospital facility to create a Trauma Center
Location: OLSZTYN, WOJ. WARMIŃSKO-MAZURSKIE
The investment included the construction of a 2-storey building, which is the reconstruction and extension of the A3 body of the Provincial Specialist Children's Hospital in Olsztyn. The building was created to create a Diagnostic and Treatment Team (ZDZ) necessary for the creation of a Trauma Center for Children. The first storey of the building has been adapted for technical purposes, while the second storey houses the treatment and administration part. Treatment rooms located on the second floor are equipped with specialized medical columns and laminar ceilings.